|

|
Municipal
Vars
Water Treatment Plant
-
Two(2) well pumps.
-
Five(5) electric driven distribution pumps, one(1)
diesel driven distribution pump.
-
GAC filters and automated backwash.
-
Sodium hypochlorite chemical system.
-
Complete monitoring and control of all flows,
levels, pressure, valve positions, equipment status, chlorine residual
analyzers, temperatures.
-
Complete remote monitoring and control via radio
link.
-
Construction inspection, commissioning.
-
Electrical and Automation Construction value:
$1,000,000.
-
Completion date: Spring 1997.
Back To Top
Return To Portfolio
|