Municipal


Vars Water Treatment Plant

 

 

 

  • Two(2) well pumps.

  • Five(5) electric driven distribution pumps, one(1) diesel driven distribution pump.

  • GAC filters and automated backwash.

  • Sodium hypochlorite chemical system.

  • Complete monitoring and control of all flows, levels, pressure, valve positions, equipment status, chlorine residual analyzers, temperatures.

  • Complete remote monitoring and control via radio link.

  • Construction inspection, commissioning.

  • Electrical and Automation Construction value: $1,000,000.

  • Completion date: Spring 1997.


Back To Top

 

Return To Portfolio